The Q-Dance Stage is one of seven temporary stages for this show. Clark Reder Engineering designed the scaffolding support structure including the concrete ballast. The scorpion scenic element was built by Christie Lites. Client: Tomorrow World LLC
2014 Celebrity Beach Bowl
Clark Reder Engineering was instrumental in the success of this massive temporary structure installed at Pier 40 along the Hudson River. The main structure provided a space for both a daytime celebrity football game as well as a nighttime concert by Jay Z. The main structure was a hybrid tent/steel concrete roof. The main superstructure […]
Ultra Fest Miami 2013
Clark Reder Engineering was the Engineer of Record for numerous steel truss and scaffold stages for this multiple weekend festival and was contracted to provide site inspection services. Client: Mountain Productions
Absolut Vodka Sculpture/Bar
Clark Reder provided peer review services as well as on-site inspection for this wood framed bar structure installed temporarily at Miami Beach for an art event. The entire structure was manufactured in Germany and brought to the US. Client: Uniplan