Clark Reder Engineering performed the structural design of the 100′ diameter flat halo truss with catwalk and perimeter aluminum truss framing for the support of 150,000 lbs of equipment and show rigging. Client: Production Resource Group
Jay Z and Beyonce Tour
Clark Reder Engineering was hired for numerous parts of the ‘On the Run’ Tour. We were hired by Tait Towers to review all the scenic elements to be rigged for the show. The pieces included a traveling LED screen, hydraulic lifts and a bunch of other components. United Production Services hired us for the structural analysis […]
Taylor Swift Red Tour at Dallas Cowboy Stadium
Clark Reder Engineering was contracted to provide structural plans for the temporary concert grid which is installed at Cowboys Stadium for concert events. We also provided structural analysis for the rigging loads associated with the Taylor Swift concert as well as on site inspection services. Client: Dallas Cowboys