ESPN Studios DC-2 Building

Clark Reder Engineering designed 25,000 square feet of total tension grid area divided over 5 spaces for ESPN’s new Digital Center 2. Client: InterAmerica Stage

LA Forum Eagles Record

Clark Reder Engineering designed the aluminum framing to support stationary portions and rotating turntable caster track.  We worked closely with the building engineer to facilitate the installation of 130,000 lbs of equipment on the roof. Entertainment Weekly Article Client: InterAmerica Stage

Madagascar Set at Sea World – Florida and California

Structural analysis of new steel and aluminum assembly with bolted and welded connections for the Madagascar Set was performed by Clark Reder Engineering. Client: 3dx

Event Center at San Jose State University

Clark Reder Engineering was hired to review the existing building drawings provided to determine the allowable rigging loads that can be supported by the existing catwalk and steel built up trusses and wide flange beams. In addition to providing an allowable rigging plan and general guidelines for rigging loads, an accurate analysis model of the building will […]

Joe Louis Arena, Detroit, MI

Clark Reder Engineering reviewed the existing steel framing for roof and storage floor to determine allowable rigging loads.  Allowable rigging loads were provided in the form of a rigging plan and details. Client: Chicago Scenic Studios

Red Bull Cliff Diving 2013

Clark Reder Engineering was hired to perform both structural design for this temporary diving platform as well as on-site coordination efforts.  The main dive structure was designed as a rigid platform.  Additionally, the existing building structure and dive area could not be impacted by the design and/or construction.  Clark Reder Engineering helped provide on-site expertise […]

Red Bull Crashed Ice 2014

Clark Reder Engineering Inc performed the structural analysis of this temporary scaffold structure stretching ¼ mile through downtown St. Paul, MN.  The course consisted of numerous obstacles, hairpin turns and bridges.  Clark Reder provided on-site structural observations and worked closely with the City of St. Paul to make this event successful. Client: Brown United  

Monster Structure at Winter X Games 2014

Etzel hired Clark Reder Engineering to provide engineering and drawings for this two story aluminum truss VIP activation structure.  The structure was laterally stabilized by both external guy wires down to ballast as well as earth anchors.  The main structure was erected using 20.5”x20.5” aluminum box truss supporting 6” aluminum beam and plywood sheathing.  The […]

Jay Z/JT Tour 2013 at Fenway

The structural analysis of the K2 Roof System (owned by G2 Structures) was done by Clark Reder Engineering. The structure was installed with 60’ aluminum truss towers supporting a 74’x55’ aluminum truss grid and included offstage wings to support additional sound and video.  The final structure supported a total show rigging load of approximately 130,000 […]

WWE WrestleMania XXX

Propmasters employed Clark Reder Engineering to design the welded steel framing and support rigging for this 200′ long sign weighing 50,000 lbs.  The sign structure was designed as modular construction to simplify lifting and attachment. The sign made the front page of the September issue of Sign Builder Illustrated. The article with more details starts […]

We are The Engineering Behind Entertainment®.
Call us today at (513) 851-1223