The structural analysis of the K2 Roof System (owned by G2 Structures) was done by Clark Reder Engineering. The structure was installed with 60’ aluminum truss towers supporting a 74’x55’ aluminum truss grid and included offstage wings to support additional sound and video. The final structure supported a total show rigging load of approximately 130,000 pounds. Clark Reder Engineering worked with the staging company, tour production team, and Live Nation to make this show a success.
Client: United Productions