Jay Z/JT Tour 2013 at Fenway

jay z jt before

jay z jt_1

The structural analysis of the K2 Roof System (owned by G2 Structures) was done by Clark Reder Engineering. The structure was installed with 60’ aluminum truss towers supporting a 74’x55’ aluminum truss grid and included offstage wings to support additional sound and video.  The final structure supported a total show rigging load of approximately 130,000 pounds.  Clark Reder Engineering worked with the staging company, tour production team, and Live Nation to make this show a success.

Client: United Productions

We are The Engineering Behind Entertainment®.
Call us today at (513) 851-1223