2012 Pan American Games – Opening Ceremony Halo Structure

2011 Pan Am Halo InstallationClark Reder Engineering performed the structural design of the 100′ diameter flat halo truss with catwalk and perimeter aluminum truss framing for the support of 150,000 lbs of equipment and show rigging.

Client: Production Resource Group

We are The Engineering Behind Entertainment®.
Call us today at (513) 851-1223