Smith Center for Performing Arts

 

Theatre Rigging_2012_Smith Center_CK Wegner (1024x231)Clark Reder Engineering designed the 90’x50′ orchestra shell ceiling that weighed 95,000 lbs.  The shell ceiling plays horizontal and stores vertically against the upstage wall.  We provided structural design of forestage orchestra reflector that deploys the same but at a slightly smaller scale.

Client: CK Wenger

We are The Engineering Behind Entertainment®.
Call us today at (513) 851-1223