Long Beach Arena

lba

Clark Reder Engineering performed the structural analysis for the 13,000 square feet of tension grid access walkway.  The tension grid is supported by custom hoists connected to the underside of the roof framing.  The hoists provide the ability to deploy the tension grid to floor level to easily access the equipment.

Client: JR Clancy

We are The Engineering Behind Entertainment®.
Call us today at (513) 851-1223