Banff Front of House Truss

Alum Truss_2011 - Banff - Calgary - James Eng (1024x678)Clark Reder Engineering was hired to design the Front of House lighting truss at this outdoor amphitheater.  The main cross stage truss spans 82′ and is supported on 40′ towers.  Clark Reder Engineering coordinated the foundation design with the a local engineering firm.

Client: James Thomas Engineering

We are The Engineering Behind Entertainment®.
Call us today at (513) 851-1223