Hard Summer – Purple Stage

Clark Reder Engineering designed the aluminum truss stage for the Hard Summer Music Festival at Glen Helen Amphitheater the in San Bernardino, California. Client: Gallagher Staging & Productions Structure Design: Dan Broadhead Project Management & Drafting: Joe Golden Lighting & Video Supplier: Aspect Lighting Aspect Account Manager: Robert Velazquez Lighting Programmer & Operator: Parker Genoway […]

Garth Brooks at Yankee Stadium

Clark Reder Engineering Inc. teamed up with G2 structures for this iconic show held at Yankee Stadium.  The K2 Aluminum Concert Roof was utilized to support production weights on the order of 200,000 pounds including 70’ wide offstage video walls.   Client: G2 Structures

Buckeye Country Superfest 2016

Clark Reder Engineering designed this 74’ wide by 72’ deep concert roof with 52’ offstage wings.  The structure was installed at Buckeye Stadium for a three day festival event.    Client: G2 Structures  

Aerosmith 2015 Blue Army Tour

RCS Corporation hired Clark Reder Engineering to design the temporary outdoor stage and roof system.  The stage and roof system were used for the first stop on Aerosmith’s Blue Army Tour at Petco Park in San Diego. Client: RCS Corporation

Bunbury Festival 2015

Clark Reder Engineering designed three temporary, outdoor roof structures for the 2015 Bunbury Music Festival in Cincinnati, Ohio.  Clark Reder Engineering also performed structural observations for the structures. Client: Loud and Clear

Grateful Dead 2015

Clark Reder Engineering was the Engineer of Record for this farewell event that was held in both Santa Clara, CA as well as Chicago, IL.  Clark Reder Engineering was responsible for the overall structural review of the roof system and delay towers. Client: G2 Structures

Jason Aldean

Clark Reder Engineering provided numerous services for the ‘Burnin It Down’ Tour at Great American Ballpark.  We worked closely with the staging company, the production team as well as the ballpark for this sold out show.  Clark Reder provided the engineering for all aspects of the roof and stage as well the special inspection services […]

Hard Summer

During assembly of the structures, Clark Reder Engineering was on site for three days providing real time engineering solutions for site specific challenges, design changes, and last-minute additions to the scope of the project. Client: Stage-Tech

Jay Z and Beyonce Tour

Clark Reder Engineering was hired for numerous parts of the ‘On the Run’ Tour.  We were hired by Tait Towers to review all the scenic elements to be rigged for the show.  The pieces included a traveling LED screen, hydraulic lifts and a bunch of other components.  United Production Services hired us for the structural analysis […]

Monsters of Rock 2014

Clark Reder Engineering teamed with Loud & Clear on the installation of a 40×40 PRT Roof grid. The grid was installed on the deck of a luxury cruise ship for three weeks of  concert themed cruises. Clark Reder assisted in both the design and installation providing on site engineering assistance. Client: Loud & Clear

We are The Engineering Behind Entertainment®.
Call us today at (513) 851-1223