Boston Ballet Under the Stars

Clark Reder Engineering was the structural engineer of record for this temporary event showcasing the Boston Ballet. The Total Structures aluminum ladder roof is 75’ wide by 55’ deep and supported on six towers. Clark Reder was responsible for the main stage concert roof structure, the front of house structure and the sound delay structures.

Client: Pro Event Inc.

 

We are The Engineering Behind Entertainment®.
Call us today at (513) 851-1223